TM100 Track Geometry Inspection System
The system features high integration and simple external wiring, allowing two people to complete track entry and exit, assembly, and inspection. It is suitable for medium- and high-speed surveying scenarios. In regions with harsh operating conditions, such as central, western, and northeastern China, it can significantly reduce labor intensity, improve the efficiency of track geometry measuring, and lower labor costs.

Before and After System Assembly

System status during measurement

Data post-processing can generate VER-format files or track fine-tuning worklists for use by tamping wagon, thereby guiding track maintenance.

After processing the data, the system can generate the absolute coordinates and absolute deviations of the track. Its output data format is compatible with established post-processing software, such as RailTuner and CARD1.

Data Post-Processing in RailTuner Software

Data Post-processing in coordinate fitting software
版权所有◎2025 北京力铁轨道交通设备有限公司 备案号:京ICP备*************号 技术支持:新网